|
The Deep Creek Watershed project was started in 1957. Several watershed structures
were constructed along North and South Deep Creek in order to reduce downstream flooding. These
structures have met their projected lifespan and are in need of repair. This project will outline
this need.
All local, state and federal laws, rules and ordinances must be followed during this
project.
Addendum No 1
This addendum shall become an integral part of the contract documents for the above-mentioned project and shall be placed in the front of the Specifications for this project.
Each bidder shall be responsible for notifying their sub-contractors of the contents of this addendum.
This addendum is intended to extend the deadlines issued in the original Request for Qualifications.
The revised deadlines for this project are as follows:
Revised Dates:
- November 8, 2019 by 5:00pm-Letter of Intent to propose submitted to the County
- Pre-Proposal Site Visit – November 15, 2019 at 10:00am. (Site Visit will begin at 217 E. Willow Street, Yadkinville, NC 27055)
- November 22, 2019 by 5:00pm RFQ submission deadline to the Issuing Officer
Firms that have already submitted a Letter of Intent to Propose do not need to re-submit those documents!
______________________________________________________________________
|
|
10/16/2019 12:00 AM
|
|
11/22/2019 5:00 PM
|
|
10/31/2019
|
|
Jason Walker PO Box 220 217 E. Willow Street Yadkinville, NC 27055 Email: jwalker@yadkincountync.gov
|
|
Yadkin County will use a combination of criteria in the evaluation process, including, without limitation, overall qualifications, relevant experience with comparable facilities, references and such other as Yadkin County may use in its sole discretion. Specialized, appropriate expertise for the type of project Organizational chart and project team expertise Proposed design approach and innovative design solutions for projects of these types Project quality control plan including recent experience with cost control, change orders, and maintaining design and construction schedules Current workload of the firm’s personnel Record of successfully completed projects without major legal or technical problems.
|
|
|
|